At a glance
- Divide the elevation into bays and cells and describe their opening types.
- Add the dimensions, tags and notes required for the schedule.
- Link a model Window and adjust the position of its comparison preview.
Bays, cells and opening graphicsSet the overall opening before adjusting its divisions.
Set the overall dimensions, then arrange the bays and cells. Their divisions describe the frame and glazing layout.
Adjust the opening graphics to distinguish fixed and operable portions. These are editable parts of the documentation drawing, rather than automatic edits to the linked model Window.
Dimensions, tags and notesChoose the information displayed around the elevation.
Use the dimension, tag and note controls to describe the window type. Their settings determine the annotation shown with the drawing.
The drawing divisions remain separate from the linked model preview. Use the comparison to check the relationship between the authored elevation and the model.
Model Window comparisonChoose the source and set how its preview is displayed.
Use the companion tool to select the model Window. The Model Window controls adjust the preview offset, comparison gap and mirroring. Refresh the preview after changing the source.
The preview uses orthographic edges from the model, including rear edges. It is a comparison view, not a hidden-line rendering, so some lines may be visible through the model.